The Start block is used to set the start point of the flow.
Connect the output of the Start block with the input of the block to start.
Example:
Result:
Start of the flow.
Tips and best practices:
The Start block does not have to be set. If no Start block is set, Centrldesk sets the start point itself.Library:
General